Sustainability Sustainability
Projects
In Progress
Central Heating Plant Equipment
Optimization- Add
electronic controls to existing boilers to better regulate their operation and
cycling behavior; plus add two variable frequency drives to existing 75 hp
motors to minimize the energy used to pump steam. Together these improvements will reduce electrical
consumption by 185,000 kWh/year.
This is equivalent to the energy saved/year in 12 homes in the
McMinnville area.
